Integrated Decision-Making in Production, ‎‎Maintenance, Repair, and Quality Planning using ‎an agent-based simulation

Authors

  • Mohamad Reza Nazabadi Department of Industrial Engineering, Science and Research Branch, Islamic Azad University, Tehran, Iran.
  • Esmaeil Najafi Department of Industrial Engineering, Science and Research Branch, Islamic Azad University, Tehran, Iran.
  • Reza Rasinojehdehi Department of Industrial Engineering, Science and Research Branch, Islamic Azad University, Tehran, Iran.

Keywords:

Simulation, Agent-based‎, Optimization‎, Metaheuristic‎

Abstract

This paper investigates the issue of integrated decision-making in production, maintenance, repair, and product quality planning in a single-machine, single-product production system with a single final product inventory. A production machine wears out from the surface, and due to its operation, it is affected by breakdowns and causes them to break down. Performing partial repairs returns the production machine's wear level to its previous state, while complete repairs return it to its initial condition. Unlike previous research, in this study, the possibility of partial maintenance repairs is limited, and reaching the maximum allowable level necessitates unavoidable complete repairs. Additionally, the quality of the final product depends on the production machine's wear and tear level; thus, as the level of machine wear increases, the likelihood of producing low-quality products also increases. At the end of each day, demand enters the system following a Poisson process, and if the final product is available, the demand is met; otherwise, orders are backlogged up to a particular ceiling, and the remaining backlog is considered lost orders. The production system under investigation was modeled in the first step using an agent-based simulation approach to extract an optimal decision combination. In the second step, by employing a simulation-optimization approach, the connection between the agent-based simulation model of the production system and metaheuristic methods was established to extract an optimal policy. The goal is to find a policy that leads to the integrated optimization of the system and minimizes production costs, maintenance and repair costs, inventory holding costs, backlogged orders, machinery breakdowns, and low-quality product production. Four scenarios were designed to evaluate the proposed method. Finally, a comparison was made between the results obtained from the proposed method and production scenarios up to the time of failure and random decision-making. The results showed that the simulation-optimization approach performs up to 30% better than other policies.

References

‎[1] ‎Liu, Q., Dong, M., & Chen, F. F. (2018). Single-machine-based joint optimization of predictive ‎maintenance planning and production scheduling. Robotics and computer-integrated manufacturing, 51, 238–‎‎247. https://www.sciencedirect.com/science/article/pii/S0736584517300649‎

‎[2] ‎Rivera-Gómez, H., Gharbi, A., Kenné, J. P., Montaño-Arango, O., & Corona-Armenta, J. R. (2020). Joint ‎optimization of production and maintenance strategies considering a dynamic sampling strategy for a ‎deteriorating system. Computers & industrial engineering, 140, 106273. ‎https://www.sciencedirect.com/science/article/pii/S0360835220300073‎

‎[3] ‎Gosavi, A. (2015). Control optimization with reinforcement learning. In simulation-based optimization: ‎parametric optimization techniques and reinforcement learning (pp. 197–268). Springer US. ‎https://doi.org/10.1007/978-1-4899-7491-4_7‎

‎[4] ‎Beheshti Fakher, H., Nourelfath, M., & Gendreau, M. (2017). A cost minimisation model for joint ‎production and maintenance planning under quality constraints. International journal of production research, ‎‎55(8), 2163–2176. https://ideas.repec.org/a/taf/tprsxx/v55y2017i8p2163-2176.html‎

‎[5] ‎Nourelfath, M., Nahas, N., & Ben-Daya, M. (2016). Integrated preventive maintenance and production ‎decisions for imperfect processes. Reliability engineering & system safety, 148, 21–31. ‎https://www.sciencedirect.com/science/article/pii/S0951832015003427‎

‎[6] ‎Nazabadi, M. R., Najafi, S. E., Mohaghar, A., & Movahedi Sobhani, F. (2024). The joint policy of ‎production, maintenance, and product quality in a multi-machine production system by reinforcement ‎learning and agent-based modeling. International journal of research in industrial engineering, 13(1), 71–87. ‎DOI:10.22105/riej.2023.298557.1240‎

‎[7] ‎Aghezzaf, E. H., Khatab, A., & Tam, P. L. (2016). Optimizing production and imperfect preventive ‎maintenance planning׳s integration in failure-prone manufacturing systems. Reliability engineering & ‎system safety, 145, 190–198. https://www.sciencedirect.com/science/article/pii/S0951832015002811‎

‎[8] ‎Chouikhi, H., Khatab, A., & Rezg, N. (2014). A condition-based maintenance policy for a production ‎system under excessive environmental degradation. Journal of intelligent manufacturing, 25(4), 727–737. ‎https://doi.org/10.1007/s10845-012-0715-9‎

‎[9] ‎Khatab, A., Diallo, C., Aghezzaf, E. H., & Venkatadri, U. (2019). Integrated production quality and ‎condition-based maintenance optimisation for a stochastically deteriorating manufacturing system. ‎International journal of production research, 57(8), 2480–2497. https://doi.org/10.1080/00207543.2018.1521021‎

‎[10] ‎Najafi, S. E., Nozari, H., & Edalatpanah, S. A. (2022). Artificial intelligence of things (AIoT) and industry ‎‎4.0–based supply chain (FMCG industry). In a roadmap for enabling industry 4.0 by artificial intelligence (pp. ‎‎31–41). John Wiley & Sons, Ltd. https://onlinelibrary.wiley.com/doi/abs/10.1002/9781119905141.ch3‎

‎[11] ‎Hadian, S. M., Farughi, H., & Rasay, H. (2021). Joint planning of maintenance, buffer stock and quality ‎control for unreliable, imperfect manufacturing systems. Computers & industrial engineering, 157, 107304. ‎https://www.sciencedirect.com/science/article/pii/S0360835221002084‎

‎[12] ‎Cheng, G. Q., Zhou, B. H., & Li, L. (2018). Integrated production, quality control and condition-based ‎maintenance for imperfect production systems. Reliability engineering & system safety, 175, 251–264. ‎https://www.sciencedirect.com/science/article/pii/S0951832017311420‎

‎[13] ‎Bouslah, B., Gharbi, A., & Pellerin, R. (2018). Joint production, quality and maintenance control of a two-‎machine line subject to operation-dependent and quality-dependent failures. International journal of ‎production economics, 195, 210–226. https://www.sciencedirect.com/science/article/pii/S0925527317303316‎

‎[14] ‎Rivera-Gómez, H., Gharbi, A., & Kenné, J. P. (2013). Joint production and major maintenance planning ‎policy of a manufacturing system with deteriorating quality. International journal of production economics, ‎‎146(2), 575–587. https://www.sciencedirect.com/science/article/pii/S0925527313003447‎

‎[15] ‎Najafi, E., & Atighi, I. (2024). Employing AI in the sustainability of smart commerce and supply chain. In ‎information logistics for organizational empowerment and effective supply chain management (pp. 139–149). IGI ‎Global. https://www.igi-global.com/chapter/employing-ai-in-the-sustainability-of-smart-commerce-and-‎supply-chain/334825‎

‎[16] ‎Ghaleb, M., Taghipour, S., Sharifi, M., & Zolfagharinia, H. (2020). Integrated production and maintenance ‎scheduling for a single degrading machine with deterioration-based failures. Computers & industrial ‎engineering, 143(10), 106432. https://www.sciencedirect.com/science/article/pii/S0360835220301662‎

‎[17] ‎Sharifi, M., & Taghipour, S. (2021). Optimal production and maintenance scheduling for a degrading ‎multi-failure modes single-machine production environment. Applied soft computing, 106, 1-21. ‎https://www.sciencedirect.com/science/article/pii S1568494621002350‎

‎[18] ‎Borshchev, A., & Filippov, A. (2004). From system dynamics and discrete event to practical agent based ‎modeling: reasons, techniques, tools. Proceedings of the 22nd international conference of the system dynamics ‎society (Vol. 22, pp. 25–29), England. Oxford. ‎https://www.anylogic.de/upload/iblock/296/296cb8fa43251a1fc803e435b93c8ff2.pdf

Published

2024-02-10

How to Cite

Nazabadi, M. R. ., Najafi, E. ., & Rasinojehdehi, R. . (2024). Integrated Decision-Making in Production, ‎‎Maintenance, Repair, and Quality Planning using ‎an agent-based simulation. Risk Assessment and Management Decisions, 1(1), 12–21. Retrieved from https://journal-ramd.com/journal/article/view/23